Taking care of little issues before they have a chance to grow into giant problems puts you ahead of the maintenance curve, where you have plenty of time to plan and prepare. But understanding the benefits of preventive maintenance is only the first step. You need a carefully planned project to get your program of inspections and tasks up and running, followed by a system for measuring results and fine-tuning tasks.ย ย
Step 1: Include all the right assets and equipmentย ย
If you donโt already have one, nowโs the perfect opportunity to generate an accurate asset registry. The only way to take care of all your assets and equipment is to know what you have.ย
The registry includes everything, but the PM program canโt.ย ย

Because there will always be limits on your time and resources, you need to carefully select which assets to add. When deciding to include an asset or not, start by looking at its level of criticality, which you can think of as the answer to the question โIf this asset fails, how much trouble are we in?โ Here, trouble can mean everything from lost production to costly repairs, from hefty government fines to increased safety risks that endanger your:ย
- Employees and visitorsย
- Facilities and the surrounding environmentย
- Company reputationย ย
Remember that criticality can be location and workflow specific. So, the air conditioner in the break room is important, but itโs much less important than the AC units cooling the server room running all the company’s mission-critical software. They could be the exact same pieces of equipment, but you need to be paying a lot more time and attention to some of them.ย
Also remember that there are assets and equipment you shouldnโt worry about at all. Run-to-failure maintenance is the right strategy if something is cheap to carry in inventory, has a low criticality, and can be repaired or replaced easily. Light bulbs are the classic example.
Theyโre cheap and donโt expire or degrade. Also, theyโre never mission critical. Think about the headlights on your car. You never do any maintenance on them and only replace them after they burn out. Their criticality is so low, you donโt even carry spares with you. Itโs different with tires.
Youโre not going anywhere with a flat, even if the other three are fine. Thatโs why you need to rebalance and rotate them regularly. Itโs also why you always carry a spare.ย
Step 2: Set up preventive maintenance tasks from multiple sources
For each asset, you need to decide on the preventive maintenance inspections and tasks (PMs) and their frequencies. Basically, what work do you need to do and how often do you do it. Itโs straightforward for newer assets: Simply follow the manufacturersโ recommendations. Theyโre the ones who designed and built it, so at the beginning no one knows the asset better than they do. On top of that, if you donโt follow the official maintenance recommendations, you might inadvertently void warranties.ย
But as time goes on, you need to fine-tune the inspections, tasks, and intervals. Generally, as an asset gets older, you need to check it more often. But itโs more than that. The longer you look after an asset, the better you know it. When it was new, the manufacturer was the expert.
Now, you are. When deciding on schedules, make sure to review historical work orders for an idea of both the failure modes and frequencies. If you know the timing belt slipped once every three months, set a PM to check and adjust the belt once every two and a half months. If the belt broke six months ago and six months before that, set a PM to replace it every five months.ย
With a modern unified facility maintenance management solution, all the information you need is in the historical work orders, where itโs safe and searchable.ย
Step 3: Set your technicians up for successย
Youโve looked at all your assets and decided which to include in the program and their associated tasks and schedules. Now itโs time to focus on the maintenance technicians.ย ย ย ย ย ย ย ย ย ย ย ย ย ย ย ย ย ย ย ย ย
Delegate preventive maintenance tasks based on skill setsย
With reactive, on-demand work orders, you often have little to no choice when it comes to choosing resources. Itโs simply a question of whoโs closest and available. But with PMs, youโre scheduling everything ahead of time, which means you can now match your resourcesโ skill sets to specific tasks. For more routine maintenance, assign newer technicians, while more senior technicians are likely better suited to more complex tasks.ย ย
Just as often, itโs not a question of experience but background trade. Your electricians can check the wiring and control panels on the production line, while mechanics need to work on the fleet.ย ย ย ย ย ย ย ย
Create data-packed PMsย
Hereโs one of the many ways modern facility management software makes setting up a good PM program so much easier. Unlike a few lines on a scrap of paper or tiny cells in a spreadsheet, thereโs endless room to add information on a digital work order. You can include everything technicians need to close out PMs properly and efficiently, including:ย
- Step-by-step instructionsย
- Customizable checklistsย
- Digital images, schematics, and OEM manualsย
- Associated parts and materialsย
- Complete asset maintenance and repair historiesย
A good platform even has interactive digital floor plans.ย
Right away, the team does every task properly because technicians never have to run back to the office for a manual, chase down a supervisor for help, or worst-case scenario, just wing it and hope for the best.ย

And long-term, youโre capturing the teamโs โtribal knowledge,โ which reduces key man risk, and establishing and enforcing standard operating procedures that meet best practices. Because the teamโs collective know-how is safely inside the software, you donโt have to worry about losing critical knowledge when someone leaves or retires. And because everyone is doing the same work the same way, itโs easier to troubleshoot when needed.ย ย ย
Step 4: Define success, and track progressย
Make sure to set realistic goals. Itโs important to remember that your PM program is only going to help prevent certain types of failures, generally issues connected to misuse and wear. But it wonโt reduce the number of infant mortality failures, usually the result of poorly manufactured assets, and random failures, which are hard to predict.ย
And make sure to set quantifiable goals that help you track the programโs success. When people go on a diet, they get on the scale once a week. They donโt bother tracking their height or shoe size because those numbers donโt tell them anything about progress toward a determined goal.ย
ย There are many key performance indicators (KPIs) to choose from when tracking a PM program.ย

For example, you can look at planned maintenance percentage (PMP), which is the percentage of your total maintenance hours that are planned. Knowing where to aim takes some benchmarking, and itโs industry specific, but many departments hope to have 80% planned vs 20% on-demand.ย
You can also look at your preventive maintenance compliance (PMC), which tells you the percentage of scheduled PMs completed within a set time. If your PMC is low, youโre missing a lot of your PMs. You do need to be careful with this maintenance KPI, though, because both late and on-time PMs count as completed.
So, the team might be weeks behind on all PMs, but if theyโre eventually completed them in the time youโre tracking, the PMC still looks great. To make the KPI more descriptive, you can only count PMs the team completed within 10% of the interval. So, a PM the team does once a month would have to be completed within three days of its original due date.ย
Preventive maintenance helps you get ahead of problems, where itโs always easier, faster, and cheaper to work. Setting up a PM program is a multistep process, but itโs also iterative. You need to keep going back and refining your work at each step to ensure the maintenance team is as effective and efficient as possible.ย